Solar Power World – Ameresco, Duke Energy constructing 1.1-MW floating solar + storage project at Fort Bragg

The U.S. Army has awarded Duke Energy and Ameresco’s Federal Solutions Group a utility energy service contract (UESC) to implement power generation and facility efficiency improvements at Fort Bragg in North Carolina.

In partnership with Duke Energy, Ameresco will deploy a 1.1-MW floating solar photovoltaic (PV) system on the Big Muddy Lake at Camp Mackall, a remote Special Forces training site at the base. A 2 MW battery energy storage system will provide a seamless transition to on-site generation during utility provider outages.

This system will supplement power from the local grid and provide backup power during electric service outages. Under the $36 million design-build contract, Duke secures third-party financing to fund construction, and the U.S. Army pays down the financing annually with the utility savings that the project generates over the term of the contract.

Read the full release (opens in new window)

Source: 

Solar Power World