Ameresco
  • Solutions
    • Energy Efficiency
      • Advanced Metering Infrastructure
      • Central Plant Upgrades
      • Deep Energy Retrofits
      • Enterprise HVAC
      • Interior Lighting and Controls
      • LED Street and Area Lighting
      • Water Management and Efficiency
    • Distributed Generation, Microgrids & Storage
      • Distributed Generation
      • Batteries and Energy Storage
      • Biogas
      • Biomass
      • Cogeneration/CHP
      • Geothermal
      • Landfill Gas to Energy
      • Microgrid
      • Renewable Natural Gas
      • Solar Power
      • Wind Power
    • Energy Infrastructure
      • Design-Build Services
      • Asset Monetization
    • Energy Analytics & Supply Management
      • Asset Planning Software Solutions
      • Demand Side Management
      • Energy Supply Management
    • Operations and Maintenance
      • Facilities Management
    • Financial Options
      • Budget-Neutral Infrastructure Upgrades
      • Design, Build, Own, Operate, Maintain
      • Energy as a Service
      • ESPC (Energy Savings Performance Contract)
      • Power Purchase Agreements
      • PACE (Property Assessed Clean Energy)
  • Industries
    • Federal Government
      • Federal Bid Opportunities
    • Healthcare
    • Higher Education
    • Housing & Community Development
    • Industrial and Commercial Buildings
    • K-12 Schools
    • Public Sector
      • Smart Cities
    • Transportation and Infrastructure
    • Utilities
  • Company
    • About
    • Locations
    • Management
    • Mission, Vision, Values
    • Awards and Certifications
  • Resources
    • B.Save Calculator
    • Press Releases
    • Project Highlights
    • Events
    • Media Coverage
    • Webinars
    • White Papers
    • Video Library
  • Investors
    • Investor Relations Overview
    • News/Events
      • Overview
      • Press Releases
      • IR Calendar
      • Email Alerts
    • Company Info
      • Overview
      • Presentations
      • Management Team
      • Contacts
      • FAQ
    • Financial Results
    • Stock Data
      • Stock Information
      • Historical Data
    • SEC Filings
      • Overview
      • All SEC Filings
      • Annual Reports
      • Quarterly Reports
      • Section 16 Filings
    • Governance
      • Overview
      • Board of Directors
      • Board Committees
      • Governance Documents
      • Contact the Board
    • Annual Meeting
  • ESG
    • Environmental
    • Social
    • Governance
    • Health and Safety
    • Giving Back
  • Careers
  • Contact
  • Search
  • Menu Menu
Abstract image created by superimposing closeups of windows in modern office buildings on top of each other

Ameresco Announces an EPCM Contract for Large Distribution Battery Energy Storage Systems for a Total of 537.5 MW / 2.15 GWh

Three Battery Energy Storage Systems at distribution level substations will provide California residents with electricity in time for next summer’s reliability challenges.

FRAMINGHAM, M.A.– October 21, 2021 – Ameresco, Inc., (NYSE: AMRC), a leading cleantech integrator and renewable energy asset developer, owner and operator, today announced that it has entered into a contract with Southern California Edison (SCE) to design and build three grid scale battery energy storage systems (BESSs) at existing substation parcels throughout SCE’s service territory in California. Due to the impact of the extreme weather events in the state, this aggressive plan will significantly increase reliability of the grid with a targeted commercial operation date in August 2022.

The substation energy storage systems will be built to address the emergency reliability risks identified in the Governor’s Emergency Proclamation aimed at utilizing clean energy resources to address electric power shortages due to extended drought, wildfire, and heatwaves. The contracted systems will be located at three distinct distribution-level substation parcels in SCE’s service territory to efficiently provide for the electricity demands in the San Joaquin Valley, Rancho Cucamonga and nearby communities and the Long Beach area.  The systems equate to 537.5 MW with a four-hour duration, for a total of 2,150 MWh.

“SCE sees a growing role for battery storage as we transition to delivering 100% clean renewable energy to customers,” said Kevin Payne, President and CEO of SCE. “The battery storage systems we have contracted for with Ameresco will make the grid more resilient to the effects of extreme weather and will help us continue our progress toward the clean energy future, which is essential to combating climate change.”

The three substation systems are a novel approach for incorporating advanced energy storage at the distribution level to solve overall system capacity and reliability needs.  They will be operated in a manner which maximizes reliability of the grid by charging during periods of excess generation and discharging during periods of need. The project will utilize a turnkey Engineering, Procurement, Construction and Maintenance (EPCM) contracting mechanism.

“Innovative cleantech projects of this magnitude have the ability to provide transformative solutions to regions in need of reliable and resilient energy,” said George Sakellaris, CEO, Ameresco. “At Ameresco, we are so pleased to be a part of a project that takes such a meaningful step in providing cleantech solutions to combat the disruptive effects of extreme weather events across the nation.”

“In recent years, California’s extensive wildfires have highlighted the necessity and importance of improved energy infrastructure. It has become clear that the time for action is now,” said Britta MacIntosh, Senior Vice President, Ameresco Western Region. “This project is proof that when we work together, we can solve for real and reliable solutions to address the needs of the State of California.”

Once completed, this project will directly contribute to the State of California’s clean energy and carbon neutrality goals and help Edison International, SCE’s parent company, meet its 2045 net-zero greenhouse gas emissions commitment.

The EPCM Agreement was entered into after September 30, 2021 and therefore such entry has no effect on Ameresco’s financial results for the fiscal quarter ended September 30, 2021.  Ameresco is evaluating the expected effect of the EPCM agreement on its financial results for the fourth quarter ending December 31, 2021 and will provide an update when it releases its third quarter 2021 financial results after the market close on Monday, November 1, 2021 and on the accompanying earnings conference call.

About Ameresco, Inc.

Founded in 2000, Ameresco, Inc. (NYSE:AMRC) is a leading cleantech integrator and renewable energy asset developer, owner and operator. Our comprehensive portfolio includes energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions delivered to clients throughout North America and the United Kingdom. Ameresco’s sustainability services in support of clients’ pursuit of Net Zero include upgrades to a facility’s energy infrastructure and the development, construction, and operation of distributed energy resources. Ameresco has successfully completed energy saving, environmentally responsible projects with Federal, state and local governments, healthcare and educational institutions, housing authorities, and commercial and industrial customers. With its corporate headquarters in Framingham, MA, Ameresco has more than 1,000 employees providing local expertise in the United States, Canada, and the United Kingdom. For more information, visit www.ameresco.com.

Safe Harbor Statement

The statement in this press release regarding the expected timing of completion constitutes a forward-looking statement within the meaning of The Private Securities Litigation Reform Act of 1995. The actual timing and completion may differ materially from that indicated herein as a result of various important factors, including the timing of, and ability to, enter into subcontracts and purchase orders; the ability to perform without unusual delay; any customer decision to terminate or delay our work on, or other risks involved with, the project; and availability and costs of labor and equipment. Currently, one of the most significant factors, however, is the potential adverse effect of the current COVID-19 (and its variants) pandemic. The extent to which COVID-19 impacts us, suppliers, customers, employees and supply chains will depend on future developments, which are highly uncertain and cannot be predicted with confidence, including the scope, severity and duration of the pandemic, the actions taken to contain the pandemic or mitigate its impact, and the direct and indirect economic effects of the pandemic and containment measures, among others.

###

Contact: 

[email protected]

Share this entry
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail

Contact Us

1-866-AMERESCO
Use our online form

Categories

  • Airports
  • Colleges and Universities
  • Commercial
  • Company News
  • ESG
  • Federal
  • Healthcare
  • K-12 Education
  • Manufacturing and Industrial
  • Media Coverage
  • Press
  • Public Housing
  • State and Local Government
  • Uncategorized
  • United Kingdom

Recent Press Releases

  • Ameresco Secures Multiyear Supply Agreement for 2,500 MWh of Battery Energy Storage Systems (BESS) with Powin LLCMay 12, 2022 - 11:19 am
  • U.S. Army Awards HSGS-Ameresco Comprehensive Solar Photovoltaic Construction ProjectMay 10, 2022 - 4:09 pm
  • Ameresco to Participate at Upcoming ConferencesMay 9, 2022 - 10:19 am

COMPANY INFO

About Us

Careers

Investor Relations

Media Coverage

Resource Center

CONTACT AMERESCO

111 Speen Street, Suite 410
Framingham, MA USA

1-866-AMERESCO

Contact Us via Online Form

Office Locations

Select Your Country

Press Releases

  • Ameresco Secures Multiyear Supply Agreement for 2,500 MWh of Battery Energy Storage Systems (BESS) with Powin LLCMay 12, 2022 - 11:19 am
  • U.S. Army Awards HSGS-Ameresco Comprehensive Solar Photovoltaic Construction ProjectMay 10, 2022 - 4:09 pm
See all press releases

STAY CONNECTED

© Copyright 2022 - Ameresco | Privacy Policy | Terms and Conditions | Site Map
  • Twitter
  • LinkedIn
  • Youtube
Scroll to top