PV Magazine – Sunrise brief: Norfolk Naval Shipyard adds battery storage and CHP
The U.S. Navy and the Ameresco Federal Solutions are expanding on-site generation at Norfolk Naval Shipyard in Portsmouth, Virginia.
This $173 million project includes a 19 MW combined heat and power plant, a 3 MW battery energy storage system, and a microgrid control system that will help reduce the amount of electricity imported from the grid by 68%.
Over the course of the 22-year performance period following construction, the project is guaranteed to generate more than $411 million in cost savings.
Read the full release (opens in new window)
Source:
PV Magazine
By: David Wagman
https://pv-magazine-usa.com/2021/02/05/sunrise-brief-norfolk-naval-shipyard-adds-battery-storage-and-chp/