Renewable Energy World – U.S. Army launches renewable energy projects at military bases

Ameresco has contracted LS Energy Solutions to supply a 6 MW/6 MWh lithium-ion battery storage system to be paired with an existing 18 MW solar PV system at the Fort Detrick Army Garrison in Maryland.

The system will be microgrid-ready and is expected to come online in early 2023. The system has a 20-year operating lifetime, according to LS Energy.

Read the full release (opens in new window)

Source: 

Renewable Energy World

By John Engel