Ameresco
  • Solutions
    • Efficiency & Demand Conservation
      • Energy Efficiency
      • HVAC & Air Quality
      • Interior Lighting
      • LED Street & Area Lighting
      • Water Management
    • Generation & Energy Supply
      • Biogas & RNG
      • Biomass
      • Cogeneration & CHP
      • Geothermal
      • Hydropower
      • Solar Power
      • Nuclear SMRs and MMRs
      • Wind Power
    • Integrated Infrastructure
      • Advanced Metering
      • Battery Energy Storage
      • EV Charging Infrastructure
      • Microgrids
    • Software & Services
      • AssetPlanner Solutions
      • Energy Supply Management
      • Operations & Maintenance
    • Financial Options
      • Budget-Neutral Infrastructure Upgrades
      • Design-Build Services
      • Design, Build, Own, Operate, Maintain
      • Energy as a Service
      • ESPC (Energy Savings Performance Contract)
      • Power Purchase Agreements
      • PACE (Property Assessed Clean Energy)
  • Industries
    • Data Centers
    • Electric Utilities
    • Federal Government
      • Federal Bid Opportunities
    • Healthcare
    • Higher Education
    • Industrial & Commercial Buildings
    • K-12 Schools
    • Public & Multifamily Housing
    • Public Sector
      • Smart Cities
    • Transportation and Infrastructure
  • Company
    • About
    • Locations
    • Management
    • Awards & Accolades
    • Certifications
    • Health & Safety
  • Resources
    • Press Releases
    • Insights & Blog
    • Project Highlights
    • Event Calendar
    • Media Coverage
    • Webinars
    • White Papers
    • Video Library
  • Investors
    • Investor Relations Overview
    • News/Events
      • Overview
      • Press Releases
      • IR Calendar
      • Email Alerts
    • Company Info
      • Overview
      • Presentations
      • Management Team
      • Contacts
      • FAQ
    • Financial Results
    • Stock Data
      • Stock Information
      • Historical Data
    • SEC Filings
      • Overview
      • All SEC Filings
      • Annual Reports
      • Quarterly Reports
      • Section 16 Filings
    • Governance
      • Overview
      • Board of Directors
      • Board Committees
      • Governance Documents
      • Contact the Board
    • Annual Meeting
  • Impact
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Ameresco Completes 5.3 MW Solar Project at 14 Knox County Facilities – the Largest Distributed, Multi-site Project in Tennessee

Knox County partnered with Ameresco for ESPC to support solar installation at 11 Knox County Schools and 3 County buildings   

KNOXVILLE, TN and FRAMINGHAM, MA – November 17, 2016 – Knox County officials and Ameresco, Inc. (NYSE: AMRC), a leading energy efficiency and renewable energy company, announced today the completion of a $12.45 million Energy Savings Performance Contract (ESPC). In the spring of 2015, Ameresco was selected by Knox County to install more than 5 megawatts (MW) of solar photovoltaic systems on the rooftops of 11 schools plus the Knox County Central Building, and ground-mount solar arrays at the Detention and Juvenile Justice Facilities. The project, recently completed, is expected to provide more than $29 million in energy savings to the County, as well as generating an aggregate approximately $14 million in positive bottom-line cash flow for the County over the next 30 years.

“Now that our solar installations are complete, we can begin to reap the benefits of our renewable energy project that will pay for itself, help to reduce our utility costs and support our community for years to come,” said Knox County Mayor Tim Burchett. “This is a fiscally responsible energy solution that helps the environment, saves taxpayer dollars and provides a great learning tool for our students.”

Ameresco and Knox County worked closely to determine the optimal financial structure, to develop the Qualified Energy Conservation Bond (QECB) application, and to finalize the technical solution. The project team analyzed over 90 Knox County School electric accounts and multiple county facilities to develop the project. As part of project design and implementation services, Ameresco provided all turnkey services to ensure the project was implemented safely, efficiently and in a manner to meet all local power company and utility regulatory and interconnection requirements. Ameresco provides a production guarantee for the life of the financing.

“Ameresco is honored to have worked together with Knox County to develop a customized technical and financial solution that is both fiscally attractive and environmentally responsible for the entire community,” said Louis P. Maltezos, Executive Vice President, Ameresco. “With this award-winning 5.3 MW solar project in the state of Tennessee, Knox County’s leadership and staff have inspired innovative renewable solutions while also generating a source of significant annual income and creating local jobs.”

Construction on the project began in August 2015. The project was designed to maximize economic and environmental benefits of Knox County’s QECB application. Local labor was utilized wherever possible, creating approximately 100 local jobs during the construction period.

This Knox County solar project was recently honored by the Tennessee County Services Association (TCSA) at its Fall Conference Awards Banquet. The project was recognized with the County Success Stories Award for sustainability. Knox County was also honored by TenneSEIA and presented with its Solar Champion Award for its leadership in deploying 5 MW of solar PV systems on 14 publicly owned buildings, including 11 schools and three county buildings.

The environmental benefits Knox County is expected to save are the equivalent of over 5,000 metric tons of CO2 per year. The green benefit from this carbon reduction is roughly equivalent to the annual GHG emissions from approximately 1,057 passenger vehicles or nearly 12 million miles a year driven by average passenger vehicles. Knox County will retain all rights to the Renewable Energy Credits (RECs).

The locations of the solar arrays include: AL Lotts Elementary School, Amherst Elementary School, Bearden Middle School, Central High School, Hardin Valley Academy, Karns High School, L&N STEM Academy, Powell Middle School, South Doyle Middle School, West High School, and the West Valley Middle School; as well as at the Detention Center, Juvenile Justice Facility, and the Knox County Central Building.

About Knox County, Tennessee
Knox County is a county located in Tennessee. According to the U.S. Census Bureau, the county has a total area of 526 square miles, of which 508 square miles is land and 17 square miles is water. With a population of 432,226, it is the third-most populous county in Tennessee. Its county seat is Knoxville, the third-most populous city in Tennessee. It is located at the geographical center of the Great Valley of East Tennessee. Near the heart of the county is the origin of the Tennessee River at the union of the Holston and French Broad Rivers. For more information, visit http://www.knoxcounty.org/.

About Ameresco
Founded in 2000, Ameresco, Inc. (NYSE:AMRC) is a leading independent provider of comprehensive services, energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions for businesses and organizations throughout North America and Europe. Ameresco’s sustainability services include upgrades to a facility’s energy infrastructure and the development, construction and operation of renewable energy plants. Ameresco has successfully completed energy saving, environmentally responsible projects with Federal, state and local governments, healthcare and educational institutions, housing authorities, and commercial and industrial customers. With its corporate headquarters in Framingham, MA, Ameresco has more than 1,000 employees providing local expertise in the United States, Canada, and the United Kingdom. For more information, visit www.ameresco.com.

The announcement of a customer’s entry into a project contract is not necessarily indicative of the timing or amount of revenue from such contract, of the company’s overall revenue for any particular period or of trends in the company’s overall total construction backlog. This project was included in our previously reported contracted backlog as of June 30, 2016.

Ameresco logo with the words Green Clean Sustainable

Contacts: 

Ameresco: CarolAnn Hibbard, 508-661-2264, [email protected]

Knox County: Michael Grider, 865.363.8681, [email protected]

Share this entry
  • Share on X
  • Share on LinkedIn
  • Share by Mail

Contact Us

Stay Connected

Categories

  • Advanced Metering Infrastructure (AMI)
  • AssetPlanner Software & Sustainability Advisory
  • Battery Energy Storage Systems (BESS)
  • Biomass, Biogas, Landfill Gas to Energy (LFGTE) & Renewable Natural Gas (RNG)
  • Canada
  • Cogeneration & Combined Heat and Power (CHP)
  • Commercial & Industrial
  • Company News
  • Controls & Building Automation
  • Cost Savings
  • Data Centers
  • Decarbonization
  • Design-Build & EPC
  • Distributed Generation
  • Electric Utilities
  • Energy as a Service (EaaS)
  • Energy Efficiency
  • Energy Saving Performance Contracts (ESPC)
  • ESG
  • Europe
  • EV Charging Infrastructure
  • Federal Government
  • Geothermal
  • Healthcare
  • Higher Education
  • HVAC, Ventilation & Indoor Air Quality
  • Impact
  • Insights
  • Interior Lighting
  • K-12 Schools
  • LED Street & Area Lighting
  • Media Coverage
  • Microgrid
  • Operations and Maintenance (O&M)
  • Power Purchase Agreement (PPA)
  • Press Release
  • Public Housing
  • Public Sector
  • Renewable Energy
  • Resiliency
  • Solar Energy
  • Transportation
  • Uncategorized
  • United Kingdom
  • United States
  • Water Management & Efficiency
  • Water Utilities
  • Wind Energy

Recent Press Releases

  • Ameresco Announces Closing of Neogenyx Fuels Joint Venture with HASI to Accelerate Growth of Advanced BiofuelsMay 12, 2026 - 4:09 pm
  • Ameresco Reports First Quarter 2026 Financial ResultsMay 4, 2026 - 4:16 pm
  • Ameresco and HASI Announce Formation of Neogenyx Fuels, a Joint Venture to Accelerate Growth of Advanced BiofuelsMay 4, 2026 - 4:09 pm

Company Info

About Us

Careers

Investor Relations

Media Coverage

Resource Center

Contact Ameresco

1-866-AMERESCO

Contact Us via Online Form

Office Locations

Stay Connected

© Copyright 2026 - Ameresco | Privacy Policy | Terms and Conditions | Site Map
  • Link to X
  • Link to LinkedIn
  • Link to Youtube
Link to: Ameresco Reports Third Quarter 2016 Financial Results Link to: Ameresco Reports Third Quarter 2016 Financial Results Ameresco Reports Third Quarter 2016 Financial Results Link to: NMSU Saves Big on Energy Contract Link to: NMSU Saves Big on Energy Contract NMSU Saves Big on Energy Contract
Scroll to top Scroll to top Scroll to top