Solar Power World – Bank of America’s Arizona campus now 60% powered by solar portfolio

Ameresco has announced the completion of a comprehensive solar PV installation for the Bank of America corporate campus in Chandler, Arizona. The campus is now home to nearly 10,000 solar modules that will offset approximately 60% of the electricity demands of the campus annually.

The 3.7-MW solar portfolio include arrays on building rooftops and covered carports, providing shade for employee and visitor parking spaces. It also includes EV charging stations, a solar-powered ATM and solar powered benches throughout the campus that employees and visitors can use to charge personal devices such as smart phones and tablets.

Read the full release (opens in new window)